The DGCP exam has 85 questions and runs 4 hours.

These 10 free DGCP questions are organized by exam domain, so you can see how each part of the Distributed Generation Certified Professional blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Qualitative Questions (69-71%)

Question 1

A preliminary review of annual utility bills suggests that CHP could be economical at a seasonal food-processing plant. Management wants to commit to a generator size before authorizing detailed engineering. Which basis would make that sizing decision most defensible?

Show answer & explanation

Correct answer: B - Coincident load profiles across seasons, matched to useful heat temperature and pressure.

Question 2

At a paper mill, measured intermediate-pressure steam extraction rises when a new drying line runs, and the extraction-condensing turbine's electrical output falls. Inlet steam mass flow and thermodynamic conditions, condenser pressure, and generator efficiency hold steady. What accounts for the lost electrical output?

Show answer & explanation

Correct answer: D - Greater extraction is diverting steam from the remaining expansion stages.

Question 3

A topping-cycle CHP plant whose installation began in 2019 uses only natural gas. Its annual review reports useful thermal output equal to 20% of total useful power and thermal output. Useful power plus half the useful thermal output, divided by fuel input on an LHV basis, is 44%. Considering only FERC's operating and efficiency standards, the plant:

Show answer & explanation

Correct answer: C - Meets both the operating and efficiency standards.

Question 4

Clear-day monitoring shows a repeatable flat top in a PV system's AC-power trace at the inverter's documented continuous AC limit. Available array power continues increasing, but DC voltage remains within its permitted range, the inverter is below its thermal-derating threshold, and no curtailment command or fault is present. The appropriate operations-log entry is:

Show answer & explanation

Correct answer: C - Normal AC power limiting; record the associated clipping loss for performance review.

Question 5

Two mutually exclusive CHP designs meet the same loads and reliability requirements. Their verified 20-year cash-flow models use the same discount rate and cost scope, and either design can be funded. Design A has an IRR of 18%, a 3-year simple payback, and an NPV of USD 700,000. Design B has an IRR of 14%, a 4-year simple payback, and an NPV of USD 1.1 million. To maximize economic value over the study period, the owner should:

Show answer & explanation

Correct answer: B - Select B; it produces the larger net benefit in present-value terms.

Question 6

A process-equipment acceptance specification requires dry saturated steam. Calibrated pressure and temperature instruments at the delivery point agree with the saturation relationship for water, but no steam-quality measurement has been made. The supplier proposes accepting the steam as completely dry on that evidence. The acceptance engineer should:

Show answer & explanation

Correct answer: D - Obtain quality evidence; saturation readings alone do not establish dryness.

Question 7

Following switchgear work, a generator and an energized bus each measure rated line-to-line voltage and frequency. Verified phase-rotation readings are ABC at the bus and ACB at the generator. The protective scheme blocks breaker closure, and instrument labeling has been checked. Which commissioning instruction is justified?

Show answer & explanation

Correct answer: A - Keep open; correct phase sequence using the approved deenergized procedure.

Question 8

A facility wants a generator for unpredictable short peak-demand events and plans to leave it cold between events. A solid-oxide fuel-cell proposal is shortlisted because its steady-state electrical efficiency is attractive. The bid has not addressed transient operation. Which missing guarantee is most consequential for this duty?

Show answer & explanation

Correct answer: C - Whether cold-start time and permitted thermal cycling meet the dispatch schedule.

Domain 2: Short Calculation Questions (22-24%)

Question 9

Two gas-engine bids quote net electrical efficiency at the same operating point: Unit A is 38.0% on an LHV basis, and Unit B is 35.0% on an HHV basis. Both use gas with an LHV/HHV ratio of 0.90. Auxiliary loads are already included. On a common HHV basis, how do the units compare?

Show answer & explanation

Correct answer: A - A is 34.2% and B is 35.0%; B is more efficient.

Question 10

Before signing off a peak-shaving estimate, an engineer checks the demand ratchet. The tariff charges USD 14/kW on the greater of the current month's peak or 80% of the highest peak in the previous 11 months. CHP reduces this month's peak from 600 to 420 kW; the highest previous peak remains 700 kW. With no other demand charges, the monthly saving to enter is:

Show answer & explanation

Correct answer: B - USD 560

The rest of the DGCP blueprint

The DGCP exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more DGCP questions with explanations.

Continue in the free practice test →

View plans